BRIGHTLINE PEDESTRIAN BRIDGE
Construction Management
Construction of a new 160 FT long pedestrian bridge crossing over NW 3rd Street that will connect the existing government center Metrorail station to the new Brightline Central Station. The construction of the bridge consists of a hybrid system of reinforced steel and pre-cast concrete.
KEY FACTS
Cost: $1.38 Million
Completion: 06/2018
Architect: Adache Group
Owner: Brightline
Rendering
Foundations
Rendering
1/3